Build a report in Unify, add charts and tables, then export or plan delivery.
Reports is the entry point for saved reports and templates. Report editing stays within Unify; there is no need to use a separate reporting portal.
Open an existing report or select New report to start another. The Automatic label identifies a scheduled example. Fictional demonstration data.
Available controls depend on the selected report type. The contents panel orders the sections; the settings panel changes the selected component or the report as a whole. Account branding supplies the applicable appearance.
Start with the report template that matches the information you need, then choose its scope and period. Fictional demonstration data.
Choose Add component, select the chart or table type and configure its source measurements. Check the selected site, time range and units. A chart component without a valid series selection cannot display production data. Reorder components and use page breaks where appropriate, then inspect the preview.
Changing report settings and changing the selected component are different operations. If a field seems unrelated to the chart, select the chart in the contents panel first.
An operations team manages 360 installations in three groups of 120. It needs one monthly management overview, a regional review and an individual report for a site under investigation. Give each saved report a name that identifies its scope and purpose, rather than creating a separate copy for every month.
Different questions can use different saved reports. The examples distinguish the full portfolio, regional selections and individual installations. Fictional demonstration data.
For a report with Report layout, choose Combined overview to bring the selected installations into one overview with totals, distribution and a ranking. Per installation applies the layout separately to each installation. These are different outputs: a list of site reports is not a combined portfolio total.
Open Choose sites and review the selected count. In this example, the saved selection contains exactly 360 sites. All current and future sites also includes installations added later; use that option only when the report should grow with the account. Searching or moving to another page in the picker does not by itself change the saved selection.
Check the selection count, not just the names on the current page. An explicit selection and All current and future sites have different meanings.
Set Report period to Last month and, for this example, Measurement comparison to The same period last year. Opening the report in November gives October's completed period. Read the displayed dates before interpreting the comparison.
The fictional October report includes all 360 selected installations, but production and grid-export readings are available for 354. Missing readings stay blank; they are not zero production.
The example reports 13,645,390 kWh of PV production and 10,773,695 kWh of grid export from the available readings. The coverage note belongs with these totals. Do not describe them as complete measurements for all 360 sites. Report-period coverage is also different from the current online count: the separate live-monitoring example has 348 communicating sites, which says nothing by itself about their October history.
Use Distribution and Ranking to find installations to inspect next. The distribution shows contributions to the selected quantity; an absolute-production ranking is not a ranking of efficiency. Large installations can produce more kWh simply because they have more installed capacity.
Move from the overview to individual installations. Keep the units, comparison period and missing-data notes visible while reviewing the ranking.
Use Export PDF for the formatted document. Where available, CSV and Excel XML export provide tabular data; Excel XML is not the same file format as an XLSX workbook. Inspect the exported pages, especially wide tables, legends, page breaks and missing-data messages.
Open the report's scheduling controls, choose an available frequency, set the recipient and period settings, and save. Check whether the schedule uses a rolling completed period or a fixed range. A fixed October report should not accidentally be reused as the November result without updating its period.
Sending a report is a separate action from saving it. Review recipients and the preview before using Send. If opening or exporting fails, preserve the saved report and retry the failed step rather than creating repeated copies.
For the same management report, open Recipients and schedule. Select a monthly frequency, day 1 and 08:00, then review the recipients and save. Keep Last month as the report period when each delivery should cover the newly completed month; a custom fixed interval remains a fixed interval. The delivery controls state the applicable time-zone behavior.
These example inboxes and the schedule are fictional. The screenshot illustrates configuration only; no email was sent. Changing the schedule is separate from sending the report now.