Prepare PV inputs and validate production, irradiation, PR and availability in a report.
The PV performance template brings production, expectation, irradiation and performance indicators together for a selected site and period. Good formatting cannot compensate for incomplete configuration, so first validate the inputs.
| Check | Reason |
|---|---|
| Correct site and production source | Avoid reporting another device or double-counting parent and child measurements |
| Installed PV DC capacity | Required for normalized yield and PR |
| Applicable PV/panel configuration | Needed for the available irradiation and expected-production calculations |
| Complete reporting dates and time zone | Keeps tables and charts on the same interval |
| Reliable energy and power readings | Prevents spikes or counter errors from being treated as valid production |
Open Properties on the relevant equipment to fill in supported configuration from installation records. Do not guess panel orientation or capacity merely to remove a warning.
Choose A selection and select the site for an individual PV report, then continue to the period and layout. Fictional demonstration data.
Compare a few days with the site's dashboard using the same period and source. A cumulative curve and a daily-production bar describe different aggregations. A missing PR is not zero PR; inspect the missing-input or data-quality message.
If the production counter has large historical jumps or disagrees with measured power, investigate those readings. Adjusting kWp changes normalized figures but does not correct the energy series. Period coverage and exclusions can also explain differences between reports from different systems.
The measured PR is measured production divided by ideal production at the measured plane-of-array irradiation. It does not require a configured PR target. A missing PR target affects expected production and goal comparisons, not the measured PR itself.
Use a combined portfolio report to identify which installations need a closer look, then validate the selected site's own PV inputs. Do not copy a portfolio conclusion into every site report. In the fictional monthly overview, six of the 360 installations have no readings for the report period; investigate those gaps separately from installations with measured low production.
The individual example is Demo Solar Park 001, with 800 kWp installed capacity and 58,240 kWh of production in October. Its specific yield is 72.8 kWh/kWp for that period. This is not a PR value: PR also needs the applicable irradiation and ideal-production basis described above.
This measurement-report example shows the drill-down from portfolio totals to one installation. It is not a screenshot of the PV-performance PDF. Production and grid export describe different flows; the power chart and the energy totals also use different units.
Before preparing the site's PV performance report:
When comparing installations, retain each site's own PR and availability. Do not add percentages or peak power readings together to create a portfolio performance percentage. A higher absolute kWh result alone does not establish better performance.
Create or duplicate a report with the new site selected, then check its own configuration and dates. A complete PV setup on one site does not automatically validate every other site in the account.