MidTeQ PULSE logo
MidTeQ PULSE logo
Accessories
AppCertificates
Configuration from A to Z
1. Link to your account2. Accessing commissioning interface3. Grid limits4. Location / address5. Add grid energy meter
8 Local Control Modes
9. PV panel configuration10. External control signals
11 Extra Information
Control response time
Customer Specific
EMSInstallationNetworkQuick StartSafety, maintenance and legal noticesSpecificationsStatus LEDs
Troubleshooting
Wiring & connectivity guidelines
Configuration from A to Z

Add grid energy meter

Note
Note

You should add the grid energy meter as the first device. This makes the rest of the configuration a bit easier.

For the specific wiring and configuration of your device, see "Supported energy meters"

For the general flow on how to add a device, see "Adding a device".

4. Location / address

Previous Page

8 Local Control Modes

Next Page

On this page

Add grid energy meter